Download Files     |      Catch us on:   

YOUR PREMIER DESTINATION FOR UNDERGROUND SERVICES

BGE - Multi Duct 26" Package - October 2014

Project Description: 

Faced with the challenging combination of boring through both hard pack clay and loose sand in one continuous shot JMF was able to successfully complete a 1500 LF bore just outside of Laurel, MD. The final package included 6 HDPE conduits ranging from 4 - 8". JMF brought in a full time mud engineer to ensure the highest possible success level for this project. JMF was also responsible for fusing, stringing, and proofing the conduits which totaled over 9,000LF.