Download Files     |      Catch us on:   

YOUR PREMIER DESTINATION FOR UNDERGROUND SERVICES

CA Murren - 24" HDPE - May 2014

Project Description: 

Installation of a 24" HDPE sleeve in one location spanning the McElroy creek in West Virginia. Total shot length was approximately 850LF, and due to the steep terrain at the exit pit location, required an precise exit at 22 degrees.