JMF successfully completed a pair of bores under a local protected creek. The allotted ROW allowed only a 10 foot separation between the 8″ steel gas main and the 12″ HDPE water line. Due to the sensitive nature of the surrounding areas, JMF kept drill fluid usage to a minimum to prevent any chance of frackout.