
JMF was responsible for installing 900LF of 16″ HDPE Waterline under a protected wetland and stream. Ground conditions varied greatly, with certain sections being soft and filled with voids, and other sections being solid rock. The mixed ground conditions required JMF to closely monitor returns to prevent and avoid frac outs. JMF takes great care when working around protected entities and is always prepared should a mud release occur.