Michels Pipeline Construction – 16″ Steel

JMF worked alongside Michels Pipeline Construction to complete a nearly 1500 LF bore in both solid and fractured rock formations in northeastern Pennsylvania. Additionally, due to the site constraints of this job, JMF was forced to bore from the top side of a large vertical change between entry and exit.The final pull of 16″ steel was completed in a single day during normal operating hours even when considering the delay for a mid weld to be performed.