National Grid – 12″ Steel Pipeline Bores – Marcy, NY

JMF was selected by John Anderson Construction and was tasked with completing the installation of 12″ Steel Pipeline via HDD boring in 5 locations. Lengths ranged between 500 and 1,800LF the longest of which was crossing of both I-90 and a large canal.